- Joined
- Jun 7, 2008
- Messages
- 440
I have tried to make it so that when a certain structure is built, it is no longer available to build. I've succeeded in this, however, A leak occurs and if there is two units building the same structure at the same time both of them finished. Ive tried making one of them stop through ordering the unit, to no avail. And im unable to limit the training of that certain unit to one.Any help?